Fox River Water Reclamation District
March 27, 2023
  • Home
    • Homepage
    • News
    • Public Notices
  • Contact
  • About
    • District Overview
    • Tours
    • Departments
    • Links
  • FOIA
  • Community Resources
    • Information
    • Skyline Water Customers
    • Billing Information
    • Career Opportunities
    • Annexations
    • Bid/Proposal Notices and Results
    • Sewer Permits
    • Industrial Pretreatment
    • Engineering Standards
    • Laboratory
    • CSO Information
    • Submit Meter Read
  • Board
  • Employee Resources
  • Downloads
Search the site...

Engineering Standards

FRWRD maintains standard details and notes, inspection and testing requirements, and record drawing submittal standards for sewer projects.

Some of the FRWRD requirements are directly related to enforcing Illinois Environmental Protection Agency standards for sewer construction.  The main goals for all FRWRD requirements are to assure consistent, high quality sewer construction within the District’s service area providing long service life of the sewers and reducing infiltration and inflow into the sewer systems.

FRWRD provides standard notes related to sewer and manhole design.  These notes are available for direct incorporation into the design drawings.  Record drawings for sewer constructed within the FRWRD service area are to be provided.  Required record drawing elements are summarized and available for download.

On sewer projects, FRWRD requires full time inspection by a resident engineer to be performed.  The resident engineer needs to be approved by FRWRD Engineering Staff for the project.  A summary of experience requirements for a resident engineer and a list of currently approved resident engineers is available for download.  Resident engineers are to provide FRWRD with copies of daily reports from the construction every two weeks.  The daily report form is provided.

Air pressure testing must be performed for sewer construction projects and where new services laterals are connecting into an existing sewer.  Air pressure testing is to be witnessed by FRWRD Engineering Staff.

The following items are available for download:

  • Image
  • PDF
  • Excel
  • Word
  • Powerpoint
  • Zip
  • MP3
  • MP4

Close

  • By Date
  • By Name
  • By Type

Close

Show all files
 | Size: 77 KB 17th Jan 2016 Engineering Plan Notes, Microsoft Word format  | Size: 11 KB 17th Jan 2016 Engineering Plan Notes, pdf format  | Size: 113 KB 5th Oct 2017 Pre-approved-inspectors  | Size: 89 KB 17th Jan 2016 Resident Engineer Daily Report Form  | Size: 97 KB 17th Jan 2016 Resident Engineer Experience Requirements  | Size: 104 KB 17th Jan 2016 Sewer Construction Ordinance 301
Next »Page 1 of « Prev

Board of Trustees:
Benjamin P. Bernal, President
Martin McCormack, Vice-President
Gary B. Hyman, Clerk-Treasurer
Steven J. Rauschenberger, Trustee
Beth Penesis, Trustee


Fox River Water Reclamation District

mailing & shipping address:
1957 N. LaFox (Rte. 31)
South Elgin, IL 60177

Phone: 847-742-2068
Fax: 847-742-0193


 

Contact Us

Downloads

© 2016 All rights reserved. Fox River Water Reclamation District - Site Map